Summary
A painstaking recovery operation was continuing last night at the scene of the Cumbria train crash.
Two carriages from the derailed Virgin train have already been lifted from the wreckage with the use of massive cranes.See the full content of this document
Extract
Painstaking Recovery at Crash Site
The first coach is now on a low-loader while the sec...
See the full content of this document
Sponsored links
